HOWDY! I'M THE PROJECT MANAGER OF SKATETRIX SPORT COMPANY!

I'M ERIC MAURER, THE PROJECT MANAGER OF SKATETRIX SPORT COMPANY!
I am a graduate mechanical engineer as well as a graduate mathematician.
I have several years of professional experience in the global industrial business!
Mainly in the Far East: Japan, Korea, China.
But also in Europe, America and beyond in some exotic Asian countries.
Everywhere I have successfully realized many complex and large industrial projects such as:
AMUSEMENT PARKS - LIQUEFIED NATURAL GAS PLANTS - POWER PLANTS - CIVIL ENGINEERING!
MY SPECIAL EXPERIENCE AND KNOWLEDGE, ACQUIRED IN MY PRACTICE AND PROVED AS A PROJECT MANAGER!
Today I work exclusively as a consultant for project management in the realization of complex industrial projects!
Organization of the cooperation between the companies involved.
Coordination of the system technology.
Procurement and purchasing.
Production and manufacturing worldwide.
Installation and turnkey commissioning.
FINANCIAL SUCCESS at the end of the WARRANTY PERIOD!
REALIZED PROJECT - ROLLER COASTER WHITE CYCLONE

WOODEN ROLLERCOASTER WHITE CYCLONE - JAPAN!
White Cyclone was constructed of enough Alaskan timber to build nearly a thousand homes!
The 1,700 m long track and fast speed will make you scream!
Do not eat before you ride it unless you want trouble with your stomach!
And for those with heart ailments, the ride is not recommended.
REALIZED PROJECT - ROLLER COASTER PEGASUS

WOODEN ROLLER COASTER PEGASUS - NETHERLANDS!
This wooden roller coaster was designed and constructed in January.
The pond where the roller coaster was to be built had to be drained.
In February, the wood, yellow southern pine, was ordered and harvested in California.
The mechanical components of the drive were evaluated and ordered.
The passenger trains were also designed and built.
One major difficulty that had to be overcome was the noise limit of 65 dB(A) during operation, as specified in the contract.
The wood that was ordered was transported by truck from California to the east coast to Savannah, Georgia, and from there shipped to the Netherlands.
The roller coaster was completed in early June and its safety was thoroughly tested in numerous test runs.
On July 1, at the start of the summer holidays in the Netherlands, the PEGASUS roller coaster was opened to passengers.
To be exactly: merely 181 days after project launch!
REALIZED PROJECT - LNG PLANT QATARGAS

LNG PLANT QATARGAS - RAS LAFFAN, QATAR!
Realized in cooperation with Japanese engineering group Chiyoda!
Qatargas 2 and Rasgas 3, both in Qatar, are the largest liquefaction plants worldwide based on capacity.
The liquefaction process consists of cooling down the natural gas to a temperature of about minus 162 degrees Celsius (minus 260 Fahrenheit) thereby turning it into liquid state.
The liquefied natural gas (LNG) is then transported via specifically fitted vessels to consumer markets.
Engineers are the dreamers who turn fantasies into realities.